How We Hire Writers

custom writing

All applicants go through a series of tests that check their level of English and knowledge of formatting styles. The applicant is also required to present a sample of writing to the Evaluation Department. If you wish to find out more about the procedure, check out the whole process.

How We Ensure Quality

Our Quality Control Department checks every single order for formatting, style, word usage, and authenticity. This lets us deliver certified assignment assistance that has no Internet rivals.

Advanced Concepts of Project Management Methodologies

 

Using the research literature you identified so far, explain the differences of TPM from a tactical as well as strategic perspective.

  • What are the short-term differences?
  • What are the long-term differences?
  • Are there any similarities?
  • What CSFs would be applied to each?

 

  • Wysocki, R. K. (2014). . Wiley.
    • Chapter 4, “How to Scope a TPM Project,” pages 103140.
    • Chapter 5, “How to Plan a TPM Project,” pages 141215.
  • Coulson-Thomas, C. (2016). . Management Services, 60(4), 3338.

Optional Case Study Examples

You may review the following case study related to project management, and if applicable, feel free to utilize it in the development of your course project:

  • Shamp, P. (2017). Scheduling strategies for construction project managers toward on time delivery (Publication No. 10605866) [Doctoral dissertation, Walden University]. ProQuest Dissertations and Theses.

Optional Readings

You may choose to read the following:

  • Okoli, C., & Pawlowski, S. D. (2004). The Delphi method as a research tool: An example, design considerations and applications. Information & Management, 42(1), 1529.
You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes