This assignment is designed for graduation. The title is Combined Solar and Wind Farm. The word count is about 13000 words. Currently, the Literature review and plan have been completed. The main structure has not yet been written. There are handbooks and some good example for the thesis. Article revision required. Deadline is 8.23
All applicants go through a series of tests that check their level of English and knowledge of formatting styles. The applicant is also required to present a sample of writing to the Evaluation Department. If you wish to find out more about the procedure, check out the whole process.