How We Hire Writers

custom writing

All applicants go through a series of tests that check their level of English and knowledge of formatting styles. The applicant is also required to present a sample of writing to the Evaluation Department. If you wish to find out more about the procedure, check out the whole process.

How We Ensure Quality

Our Quality Control Department checks every single order for formatting, style, word usage, and authenticity. This lets us deliver certified assignment assistance that has no Internet rivals.

lesson learned1

During a project, it is a best practice to learn from these experiences and continue to improve on the project and how we are completing it based on what is and is not working. 
As a result of each two-week session, the project manager will conduct a lessons learned with the team and post a short paragraph to share what is and isn’t working around both the content of project management and the process of the team.  (One of my tricks is to always phrase posted lessons learned to the positive – it is easier to share what TO DO versus what not to do).  What should you as a team keep doing?  Or stop doing?  Or start doing?  From a project management content perspective, what tools/techniques are valuable?  What can be done differently? 

for first couple weeks me and my team did the project background analysis and scope analysis of the project, we did online meeting and assign each part to different member, and we asked the instructor and other groups about the stuff we were not sure. I have attached the project under.

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes