How We Hire Writers

custom writing

All applicants go through a series of tests that check their level of English and knowledge of formatting styles. The applicant is also required to present a sample of writing to the Evaluation Department. If you wish to find out more about the procedure, check out the whole process.

How We Ensure Quality

Our Quality Control Department checks every single order for formatting, style, word usage, and authenticity. This lets us deliver certified assignment assistance that has no Internet rivals.

Management

WBS

Deliverables-based WBS
WBS Level 1 is the name of the project
WBS Level 2 has to represent 100% of the scope
Take one or two Level 2 WBS elements and breakdown until you document 25 tasks
Resource Management Plan

List of roles, responsibilities, and skills/experience
Match resources (both people and physical) to the 25 task-level WBS elements
Staffing plan (how will you staff the project)
Organization chart
RACI table (roles against deliverables)

Readings

Project Management Institute (2017).  A Guide to the Project Management Body of Knowledge: PMBOK () Guide, 6th Edition (Links to an external site.).

Part 1, Chapter 9
Part 2, Chapters 3.5, 3.15-3.16
Larson, E. W., & Gray, C. (2017). Project Management: The Managerial Process with MS Project. McGraw-Hill.
Chapter 10 Being an Effective Project Manager
Chapter 11 Managing Project Teams

Please watch the following videos to augment your reading:

Andy Kaufman. (2015).
Work Breakdown Structure demonstration.  (Links to an external site.)

Minimize Video
Terri Wagner. (n.d.). Building a work breakdown structure (Links to an external site.).

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes