How We Hire Writers

custom writing

All applicants go through a series of tests that check their level of English and knowledge of formatting styles. The applicant is also required to present a sample of writing to the Evaluation Department. If you wish to find out more about the procedure, check out the whole process.

How We Ensure Quality

Our Quality Control Department checks every single order for formatting, style, word usage, and authenticity. This lets us deliver certified assignment assistance that has no Internet rivals.

Week 5 Project

Fundamentals Of Project Management

Due February 17, 2020

Week 5 Project

Instructions

Resource and Time Budgets

You are going to be the project manager for the construction of a large warehouse for a major international company. Of course, there are many elements involved in constructing such a large facility, but this assignment will consider only one, the laying of the facilitys foundation (which is obviously preceded by site preparation and followed by the actual construction of the building).

In preparation for completing of this element of the projectlaying the facility foundationcomplete the following: 

  • Locate a source of data for the hourly wages that will need to be paid to those who will pour and finish the concrete foundation (the Bureau of Labor Statistics of the United States government is a good source for such information).  Be sure to document the source of your hourly wage data for such concrete workers. 
  • Locate a source of data for the cost of a cubic yard of reinforced concrete.  Be sure to document the source of your reinforced concrete cost data. 
  • Assuming that eight workers will be needed for the completion of the project, that they will work five days per week for 10 hours per day, and that it will take them three full weeks to complete the pouring of the foundation, what is your estimate (based on the hourly wage data that you located) of the labor expense of pouring the foundation? 
  • Assuming that the foundation will require 400 cubic yards of concrete, what is your estimate (based on the hourly wage data that you located) of the cost of the materials needed for pouring the foundation? 
  • How would Overhead charges (review the Budgeting chapter if you do not remember learning about this term) impact the two estimates that you have calculated? 
  • How would an increase in the cost of steel (one of the components of reinforced concrete) impact the budget that you had developed? 
  • If the construction site was impacted by a hurricane during the preparation of the foundation (meaning that work had to be temporarily stopped), how would the overall schedule of the construction project be impacted? 

Submission Details:

  • Provide your answers in a 3- to 4-page Microsoft Word document, using APA style. 
  • Support your responses with examples and research.
  • Name your document SU_MGT3035_W5_LastName_FirstInitial.doc.
  • Submit your document to the Submissions Area by the due date assigned.

 

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes